Sand, a base, a sub-base. The guideline gives each a thickness. source

IRC:SP:63-2018, Table 1. Sub-base: stronger ground first, then weaker.
UseBlocksSand bedBaseSub-baseGrade
Footpath, cycle track source60 mm30 mmnone200 mmM-30
Residential street source60 to 80 mm30 mm250 mm200 or 250 mmM-40
Collector street, bus or truck parking source80 to 100 mm30 mm250 mm200 or 250 mmM-40
Arterial street, container yard source100 to 120 mm30 mm250 mm200 or 250 mmM-50

Or 150 mm of base under 100 mm of lean concrete. Arterial street, container yard. source

Residential street

Drawn to scale, on ground of CBR 5 to 10.

The sand bed

Thin, even, sharp.

  • 30 mm

    Compacted, give or take 5. source

  • Loose

    30 to 50 mm before the plate. source

  • Not thicker

    A thick bed will not hold a level. source

  • Sharp sand

    Angular, free of clay. source

  • Not a filler

    Mend hollows in the base first. source

The joints

A joint is part of the pavement.

  • Finer sand

    Finer than the bedding sand. source

  • No cement

    Not in the jointing sand. source

  • Dry

    As dry as you can get it. source

  • Full

    An empty joint lets blocks work loose. source

  • Then traffic

    None until every joint is full. source

Edges and after

What holds it, what keeps it.

  • Edge restraint

    Kerbs or edge blocks hold the sides. source

  • Strong edges

    Concrete of 30 MPa or more. source

  • Compaction

    Two passes of the plate, at least. source

  • Weak ground

    CBR under 5: stabilise it first. source

  • A week on

    Look for sand lost from joints. source